Traffic shift to start Monday August 22

Traffic shift to start Monday, August 22

 

CAMERON, Mo – As part of the ongoing bridge deck replacement project on U.S. Route 36 at the Interstate 35 interchange, traffic will move head to head in the westbound lanes as contractors from Emery Sapp and Sons, Inc., working with the Missouri Department of Transportation, replace the eastbound bridge deck. After the eastbound bridge is complete, traffic will crossover to the new bridge while the westbound bridge is replaced.

The medians between the eastbound and westbound bridges are closed during construction, preventing all left turns in all four directions at the interchange. Traffic is being redirected through Cameron until construction is complete and left turns resume. There is also a 14-foot width restriction placed on the project.

There will be both day and night work throughout the project, with occasional weekend work in case of bad weather. Crews anticipate project completion by December 15, 2016, weather permitting. Motorists should expect lane closures and possible delays for the duration of the project.

MoDOT encourages all motorists to slow down, buckle up and drive safely to ensure everyone can Arrive Alive.

Trending Video

My Cameron News

BB Highway
P.O. Box 498
Cameron, MO 64429
PHONE: (816) 632-6543
FAX: (816) 632-4508
Email: editor@mycameronnews.com

Privacy Policy
 

Sign Up For Breaking News

Stay informed on our latest news!

Manage my subscriptions

Subscribe to Breaking News feed